Lock Out/Tag Out (LOTO) Safety Procedure

What is an isolation list in Lock Out/Tag Out (LOTO) procedure?

An isolation list is a list that identifies all the different components that need to be locked out or tagged out during the LOTO procedure for a particular machine or equipment.

Which components should be included in the isolation list?

1. Lock out locations 2. Electrical disconnects 3. Control switches 4. Suctions 5. Discharge 6. Block valves

Answer:

Lock Out/Tag Out (LOTO) is a safety procedure used in industry to ensure that dangerous machines are properly shut down and not started up again until maintenance or repair work is completed. An isolation list is a list that identifies all the different components that need to be locked out or tagged out during the LOTO procedure for a particular machine or equipment.

Lock Out/Tag Out (LOTO) is a safety procedure used in industry to ensure that dangerous machines are properly shut down and not started up again until maintenance or repair work is completed. An isolation list is a key component of the LOTO procedure as it helps in identifying and isolating potential sources of energy or substances that could pose a risk to workers.

The isolation list should include the following components:

1. Lock out locations: These are the places where locks are placed to prevent the operation of the equipment or machine.

2. Electrical disconnects: Devices used to physically disconnect electrical power from the equipment.

3. Control switches: Switches that control the operation of the machine.

4. Suctions: Openings or outlets used to remove substances from the equipment.

5. Discharge: Outlet of the equipment where the substance or product is released.

6. Block valves: Valves used to stop the flow of substances or fluids in the equipment.

By including these components in the isolation list, it ensures that all potential sources of energy or substances are properly isolated to eliminate the risk of accidents or injuries during maintenance or repair work.

← Hidden lines in auxiliary views unveiling the unseen details Understanding raid 5 and raid 0 stripe size →